Choose a New Hampshire striping contractor by what they put in writing: a measured scope with quantities, the paint and line width, ADA details that match the 2010 Standards, proof of insurance, a warranty and a schedule that fits your tenants. Nine questions below get you there. Ask all of them and the bids sort themselves.
This guide is written for property managers, facility managers, HOA directors and general contractors who sign for a lot and answer for it afterward. A crooked stall line is cosmetic. A misplaced access aisle, a missing sign or a closed lot on a Saturday in December is a complaint, a fine or a liability claim.
TL;DR
- Get every bid itemized: stall count, line footage, arrows, crosswalks, curb markings, stencils, paint type, line width and exclusions.
- Check ADA work against the federal 2010 Standards and New Hampshire’s sign rule, not against the contractor’s word.
- Ask for a certificate of insurance and a written warranty before you sign, and compare scheduling terms as closely as price.
- Treat a bid with one lump sum, no quantities or no exclusions as unfinished.
- Match the contractor to the job: warehouses, fire lanes and thermoplastic need proof of similar work.
Table of Contents
- Why the contractor matters more than the paint
- The nine questions
- Perspective: what we see on bids
- How to compare the bids once you have them
- Warning signs in a bid or contractor
- Working with us
- FAQ
- Sources
Why the contractor matters more than the paint
Most striping bids look alike on the last line. The difference shows up in layout, prep and follow-through. A contractor who measures the lot, marks it out and strips old lines properly gives you a layout that holds up. One who paints over faded lines from memory gives you a lot that drifts a little more with every restripe.
Striping is also a compliance job. Accessible stalls, access aisles, fire lanes and crosswalks are where owners get cited or sued. If you are not sure the lot is due, our guide on when a parking lot needs restriping covers the signs.
The nine questions
1. What exactly is in the written scope?
A professional bid should name the measured area, the stall count and the quantities for striping, arrows, crosswalks, curb markings and specialty stencils, according to SurfaceMeasure’s bidding guide. It should also carry a schedule, a list of exclusions and a price-hold date.
If you get “restripe lot, $X”, ask for the breakdown. You need to know whether 140 stalls means 140 stalls, whether the handicap symbols are included, and whether the fire lane curbs are in or out. When a contractor lists assumptions and exclusions plainly, that is the best protection against surprise change orders later.
If you collect several proposals for the same property, a short comparison sheet helps. Our friends in other trades have written well on comparing contractor bids, and the principle carries over: put each bid’s scope side by side and look for what one includes that another leaves out.
2. What materials, and at what thickness?
Bids should state paint type, line width, mil thickness and glass bead application, plus the surface preparation required, so that you can compare like for like, as OneCrew’s contractor guide puts it. Standard stall lines are commonly four inches wide; if a bid does not say, ask.
Ask whether the product is waterborne paint, solvent paint or thermoplastic, and why they recommend it for your surface. Paint suits most asphalt lots. Thermoplastic is a heavier, longer-wearing option often chosen for crosswalks, stop bars and high-traffic zones. A contractor should explain the tradeoff in terms of your traffic and your repaint cycle, not just push the most expensive line item.
3. How do you prepare the surface and lay out the lot?
Prep is where cheap bids cut corners. Ask what happens before paint touches pavement: sweeping or blowing debris, removing old markings that no longer fit the layout, and how loose or failing asphalt is handled. If the layout is changing, the old lines must come out, or drivers will follow ghost lines.
Then ask how the layout gets onto the ground. We use laser-guided equipment so that lines run straight and the layout matches the plan, and you should ask any contractor how they get the same result: a reference line, a measured plan, or an eye and a chalk line. For a lot with an existing site plan, ask them to work from it and flag differences before they paint.
If the pavement itself is the problem, striping over cracks and failed patches wastes money. Ask whether crack sealing or sealcoating should come first, and whether the same crew can sequence them so the new lines go on last.
4. Can you show me how you handle ADA stalls and access aisles?
This is the question that separates professionals from painters. The ADA.gov parking guidance sets car-accessible spaces at a minimum of 96 inches wide, with access aisles of at least 60 inches, and van spaces at a minimum of 98 inches of vertical clearance. Access aisles must be level and run the full length of the space, and they must be marked to discourage parking in them.
Slope matters as much as width. The ADA restriping compliance brief states that accessible spaces may not exceed a 1:48 slope (2.08%) in any direction and must sit on the shortest accessible route to an accessible entrance. A contractor who stripes a compliant-looking space on a sloped patch of asphalt has handed you a violation. Our explainer on the 1:48 slope limit walks through how to check this before restriping.
New Hampshire adds a sign rule. RSA 265:73-a says a reserved space must be marked by a sign on a post or building, clearly visible to anyone approaching, and it sets a $250 fine for the owner for sign placement failures. So ask who supplies and installs the signs, and whether that is in the scope or billed separately. Painted symbols alone do not satisfy the rule.
On color, the 2023 MUTCD says blue markings may supplement white ones for spaces for persons with disabilities. So blue is permitted, not required, and a contractor who says otherwise has not read the manual.
5. What standards do you work to in New Hampshire?
For public-facing details such as accessible parking and pedestrian crossings, NHDOT publishes standard plans for pavement markings, including PM-11 for accessible parking and PM-15 for pedestrian crossings. A contractor who works to ADA and MUTCD requirements should know these exist and can tell you where your lot follows them. This matters most on lots that connect to a state or municipal road, or where a town reviewed the site plan.
Ask the contractor to name the standard behind each marking type on the bid. You are not asking for a lecture. You are checking that the answer comes quickly.
6. What does your insurance cover, and can I see the certificate?
Ask for a certificate of insurance showing general liability and workers’ compensation, sent to you directly. Do not accept a promise to send it later.
New Hampshire public bids give a sense of what is normal. Barrington’s 2026 pavement-marking request for proposals calls for at least $1,000,000 in liability coverage and appropriate workers’ compensation. It also expects the contractor to supply materials, traffic control, cones, signs and equipment. Greenland’s crack sealing request for proposals asks for commercial general liability of at least $2,000,000 per occurrence and in aggregate, plus statutory workers’ compensation. Those are municipal requirements, not rules for your private lot, but they are a fair benchmark for what a serious contractor already carries. Your own lease, lender or insurer may set a different number, so check with them and your insurance agent.
If work touches a city right-of-way, local licensing can apply too. Dover, for instance, requires paving contractors to hold a city license and provide proof of insurance and a 24-hour emergency contact before working on city roads or on a private drive that affects a right-of-way. Ask your town’s public works office whether anything similar applies at your entrance.
7. How will you work around my tenants and traffic?
A lot cannot simply close. Ask how the contractor phases the work: half the lot at a time, overnight, early morning, or a Sunday for retail. Ask what the cure time is before cars can park, how they block off stalls and what signage or cones they bring. The municipal examples above show the same logic: they spell out required mobilizations, weather conditions and completion deadlines, and you should expect the same discipline on a private bid.
New Hampshire’s season shapes this. Paint needs dry pavement and suitable temperatures, so the best slots fill up in spring and early fall. Ask what happens if rain pushes the date, and whether a second mobilization costs extra. Our posts on working around busy retail lots in Manchester and scheduling around Seacoast traffic in Portsmouth show what this looks like on real sites.
8. What is the warranty, and what voids it?
Get the warranty in writing: what is covered, for how long, and which conditions void it. A one-year warranty on workmanship is a reasonable thing to ask for, and we give one on all our jobs. Ask whether it covers fading and peeling from poor adhesion, and whether it excludes damage from plows, salt or failed pavement underneath. A warranty with vague wording is a promise you cannot collect on.
9. Have you done this kind of site before?
Experience should match your property. Ask for references and photos from sites like yours:
- Retail and multi-tenant lots: high stall counts, night or weekend work, heavy ADA content.
- Warehouses and industrial yards: aisle lines, pedestrian walkways, dock zones and safety markings, which are a different skill from stall lines. See our warehouse marking work for the scope.
- Fire lanes: the local fire marshal usually dictates the markings and the wording, so ask whether the contractor has worked from a fire department requirement before.
- Thermoplastic: ask who applies it and whether they have the equipment, or whether it is subcontracted.
- HOAs and municipal sites: often need sports courts, playgrounds or board-approved layouts. We cover sports courts, playgrounds and municipal marking as well.
Call two references and ask one thing: did the crew finish when they said they would?
Perspective: what we see on bids
We walk lots every week, and the pattern is consistent. Owners rarely regret paying a little more for a measured layout. They regret the bid that looked cheapest and then needed a change order for the handicap signs, the arrows or the removal of old lines nobody priced.
Our approach is to measure first, and we use laser-guided equipment so the lines are straight and the layout is exact. We build the estimate around your operations, not ours, which is why scheduling is part of the conversation from the first call. Quick estimates matter because managers often have a deadline, and we can quote from satellite imagery when a site visit would slow things down. Everything we do is meant to meet ADA and MUTCD standards, and we stand behind the work for a year.
If a contractor cannot explain why a line is where it is, keep looking.
— Rich
How to compare the bids once you have them
Put the bids side by side and go line by line. Costs depend on stall count, line footage, markings, surface condition, schedule and mobilization, so each of those should appear separately in every proposal. If one bid leaves out a line that the others include, ask why before you compare totals.
Here is a simple checklist you can use:
| Check | What a complete bid shows | What a weak bid shows |
|---|---|---|
| Scope | Stall count, arrows, crosswalks, curbs, stencils | “Restripe lot” |
| Materials | Paint or thermoplastic, line width, beads | “Traffic paint” |
| ADA | Spaces, aisles, signs, slope check | Symbols only |
| Prep | Sweeping, removal of old lines, crack repair | Not mentioned |
| Schedule | Phasing, cure time, weather plan | “We’ll call you” |
| Insurance | Certificate supplied | “Fully insured” |
| Warranty | In writing, with exclusions | Verbal |
| Exclusions | Listed | Blank |
Price context helps too. Our breakdowns of striping costs in New Hampshire and what NH DOT bids reveal in Nashua explain what moves the number. Small jobs often run into a minimum charge. Ours is $1,260 per job, so ask every contractor for theirs, because it changes the math on a small lot.
When the paperwork across bids is truly comparable, a compliance matrix built from the tender documents is a good model for tracking each requirement against each bidder, which is useful on larger multi-site portfolios.
Warning signs in a bid or contractor
- A single lump sum with no quantities. You cannot compare it, and you cannot hold anyone to it.
- No mention of removal. If the layout changes, old lines must go.
- ADA treated as an afterthought. No slope check, no sign plan, no aisle dimensions.
- No certificate of insurance on request. A good contractor sends it the same day.
- Pressure to sign on the spot. A real price should hold for a stated period.
- No exclusions listed. Everything unlisted is a future change order.
- No local references. Ask for NH or New England sites.
One caution on all of the above: if a bid proposes to move or add accessible spaces, have the layout checked against the 2010 ADA Standards by your architect, engineer or an accessibility specialist, since the final responsibility rests with the property owner.
Working with us
If you want a bid that answers the nine questions, we can quote line striping and pavement marking across New Hampshire and the rest of New England, with marking removal, ADA layouts, fire lane and handicap striping, crack sealing, sealcoating, sweeping and power washing available from the same crew. See our New Hampshire striping page or our full services, and look at recent work before you call. We also take on SDVOSB contracts, so if that status matters for your project, ask us about it on our home page.
FAQ
How many bids should I get for a parking lot striping job?
Three is a practical number for most lots. Fewer gives you no baseline, and more usually just adds noise. Give each contractor the same scope and the same site information so the bids are comparable.
Is the lowest striping bid ever the right one?
Sometimes, if it is itemized and matches the others on scope, materials, insurance and warranty. A low bid that leaves out removal, ADA signs or exclusions is usually a partial price. Compare line by line before you decide.
Does New Hampshire require a sign for every accessible space?
Yes. RSA 265:73-a requires a reserved space to be marked by a sign on a post or building that is clearly visible to anyone approaching. Painted symbols on the pavement are not a substitute, so confirm signs are in the scope.
When is the best time to schedule striping in NH?
Spring through early fall, when pavement is dry and temperatures suit the paint. Popular dates fill early, so request estimates well before you need the work. Ask your contractor about weather delays and whether a rescheduled visit costs extra.
Sources
- How to Bid Parking Lot Striping (Example), SurfaceMeasure
- How to Bid Parking Lot Striping: 2026 Contractor Guide, OneCrew
- Accessible Parking Spaces, ADA.gov
- ADA Compliance Brief: Restriping Parking Spaces
- New Hampshire RSA 265:73-a, Parking Signs; Disabled
- MUTCD 2023, 11th Edition, Part 3
- NHDOT Standard Plans for Road Construction
- Request for Proposal Pavement Markings, Barrington, NH
- Crack Sealing RFP, Greenland, NH
- Construction Guidelines, City of Dover, NH
